|

Blog Full With Right Sidebar

Caption placed here
4
Oct

Heerema completes Golden Eye platform removal

Heerema’s Thialf has safely removed Shell U.K. Limited’s Goldeneye wellhead platform after installing the structure in 2003. The operations included removing the 1280 metric ton topside and the 3019 metric ton jacket before transportation to the AF Environmental Base in Norway for...
Read More