|

News

Heerema completes Golden Eye platform removal
4
Oct

Heerema completes Golden Eye platform removal

Heerema’s Thialf has safely removed Shell U.K. Limited’s Goldeneye wellhead platform after installing the structure in 2003. The operations included removing the 1280 metric ton topside and the 3019 metric ton jacket before transportation to the AF Environmental Base in Norway for recycling and reuse.

Goldeneye Platform

The Goldeneye platform was located in the Central North Sea, in the United Kingdom Continental Shelf, around 100 km northeast of the Aberdeenshire coast. The platform included five platform wells in 120 m water depth with a direct tie-back via the Goldeneye pipeline to the St. Fergus onshore facility. It was operational as a gas-producing field from 2004, and cessation of production was granted in 2011.